Following our successful work in Phase One of the Ashlawn School Glazing Redevelopment, WD Group was once again appointed as the preferred glazing subcontractor for Phase Two.
Using high-performance Kestrel Aluminium Window and Door Systems, we manufactured and installed 97 top-hung windows, all fitted with restricted hinges to meet strict school safety regulations. The windows were designed with 150mm cill sections, achieving a clean and consistent look with black external and silver internal accessories for a sleek, modern finish.
To ensure thermal performance and security, we installed Kestrel thermal framing and commercial door systems, with all entrances meeting PAS24 security standards – delivering safety, energy efficiency, and aesthetic appeal in one seamless package.
Our involvement at the Ashlawn School Glazing project highlights WD Group’s reputation for reliability and technical excellence. By combining safety-led design with modern aesthetics, we’ve helped create a durable, energy-efficient learning environment built to stand the test of time.





