WD Group was appointed by Kier Construction to deliver the complete aluminium glazing and access package for the new Mayfield School in Portsmouth. Built within a live operational school environment, the project required careful planning and coordination to ensure the existing school remained fully operational throughout the build.
The Challenge
Working on a constrained live education site required meticulous planning, safe working practices and close coordination with Kier Construction and other trades to minimise disruption while maintaining programme.
WD Group Solution
Over a six-month programme, WD Group supplied and installed:
- Senior Pure Tilt & Turn Windows
- Senior SF52 Curtain Walling
- Senior SF501 Thermal Doors
- Automatic door entry systems
- Steel doors compliant with Sport England requirements
- Teleflex gearing to high-level windows for natural ventilation
Outcome
The completed project delivers a secure, durable and energy-efficient façade solution, demonstrating WD Group’s expertise in delivering high-quality aluminium glazing systems for Tier 1 contractors across the education sector.






