Installations

Before installation commences a site induction and briefing on the scope of works is given to all operatives by our Projects Manager. Our Projects Manager ensures all safe working practices are in place, programme of works is not deviated from, all operatives have the correct PPE and installation checks carried out during the contract, etc.

Our installation operatives abide by our own Code of Practice as well as abiding by the company’s site installation supervisory rules and regulations. This ensures that each installation operative abides by the Glass and Glazing Federation (GGF) guidelines for window installation. All site staff and installation operatives undergo training in health and safety, safe site working and are CRB checked.

The removal of any existing frames is carried out carefully to minimise any potential damage to reveals, plaster work and decor. All apertures are dressed down and prepared to receive new frames. All Window & Door installations are carried out to the highest standard possible.

Sectors:

  • Education
  • Healthcare
  • Retail
  • Residential
  • Rail
  • Commercial

 

CASE STUDIES

View a selection of recent case studies in our various sectors

HYDRAFORCE
HYDRAFORCE

Window and Door Commercial were appointed by multi-disciplinary contractor the Buckingham Group to supply and install the complete aluminium windows, doors and curtain walling to the façade of the factory office.

View Project

HILL WEST SCHOOL
HILL WEST SCHOOL

In the early part of 2015 Hill West Primary School in Sutton Coldfield was granted emergency funding for total refurbishment as the building was deemed hazardous for the schools pupils and staff that occupied the building.

View Project

TREDEGAR ROAD
TREDEGAR ROAD

The WD Group were contracted to manufacture and install all Windows, Doors and Curtain Walling to the Tredegar Road Development in London. The Apartments were completed in 2013.

View Project

VODAPHONE
VODAPHONE

The WD Group were acquired by our clients to replace the double glazed units of the main building through floors 1-4 and also replace the aluminium screens to the ground floor using the Kestrel Thermally broken systems. 

View Project

DIVISIONS

The WD Group has a number of commercial divisions, please click on any image to find our more.

MANUFACTURING
MANUFACTURING
MAINTENANCE
MAINTENANCE
INSTALLATIONS
INSTALLATIONS
DESIGN
DESIGN
TRADE
TRADE

Contact Us

The WD Group, Unit T Riverside Industrial Estate,
Atherstone Street, Tamworth, Staffordshire, B78 3RW

Tel. 01827 281139  Fax. 01827 254981
Email. info@windowanddoor.co.uk
Company No. 3737054